Boulogiannis Constantinos
PUBLIC WORKS
- CONSTRUCTION OF A ROUNDABOUT ON THE LARISSA-TRIKALA RING-ROAD
- LANDSCAPING OF THE NEA POLITEIA SWIMMING POOL AREA
- LOW-TRAFFIC ROADS (ASKLIPIOU-LARISSA)
- LOW-TRAFFIC ROADS (ILIODOROU-ROUSVELT-LARISSA)
- URBAN REGENERATION PROJECTS IN THE OPEN SPACES OF TYRNAVOS
- "Civil Engineering and Installation Works relating to the Expansion of the 150/20kV Mantoudi Substation"
- AGIOS DIMITRIOS POWER PLANT. BUILDING FOR THE REPAIR AND REFURBISHMENT OF LIGNITE MILL TURBINES UNITS I TO V
- Ptolemaida Power Plant. Completion of new machine shop and staff changing rooms
- Servia 150/15 kV substation – 7th extension – 6TH & 7TH REVISION AND PTOLEMAIDA 150 KV/MT SUBSTATION
- CONSTRUCTION OF CONVEYOR BELT BASES T/D K1 (W=1800 MM), T/D 14 (W=1200 MM), T/D 15 (W=1200 MM) AND CARRIER K 1.1 OF THE MAVROPIGI MINE
- CONSTRUCTION OF THE 1ST SECTION OF STRUCTURAL WORKS FOR CONNECTING AND COLLECTING CONVEYOR BELTS FOR THE KARDIA FIELD MINE - SOUTHWEST LKDM FIELD
- CONSTRUCTION OF MACHINE SHOP BUILDING FOR SOUTHWEST FIELD MINE
- STRUCTURAL WORKS FOR NEW ONP JUNCTION AT LKDM
- 400/150KV AMYNTAIO SUBSTATION - EXTENSION N 3 E.P.M.
- SMALL HYDROELECTRIC POWER STATION (MYES) WITH A CAPACITY OF 1.9MW IN THE LOCATION "HIGH AREA OF VELVENTOU ESTATES" IN THE LAFISTA STREAM OF THE MUNICIPALITY OF VELVENTOU, KOZANI
- ORGANIZATION, MANAGEMENT, AND RECONSTRUCTION OF COMMON AREAS IN THE CENTER OF VELVENTOS
- ROAD NETWORK RESTORATION ROAD WORKS FROM THE FLOODS OF JANUARY AND FEBRUARY 2018 (ANILIO - TSAGARADA SECTION)
- CONSTRUCTION OF THE SECOND SECTION OF STRUCTURAL WORKS FOR CONNECTING AND COLLECTING CONVEYOR BELTS AT THE KARDIA MINE - SOUTHWEST OF LKDM
- CONSTRUCTION OF CONVEYOR BELT PLATFORMS AND FLOORS AT LKDM
- AES KARDIA STORAGE BUILDING FOR TURBINE SPARE PARTS
- CONSTRUCTION WORKS FOR THE E7 EXCAVATION BRANCH OF THE SOUTH FIELD MINE
- AG. DIMITRIOS POWER PLANT. CHANGING ROOMS & WORKSHOP BUILDING FOR THE TEFRAS SYSTEM TEAM
- KYT 400/150 KV AMYNTAIO. ADDITION OF A METAL CONTROL BUILDING AND MT PANELS, 18 M LONG, AND CABLE CHANNELS
- CONSTRUCTION OF A STAFF CHANGING ROOM BUILDING FOR THE SOUTHWEST FIELD MINE
- CONSTRUCTION OF A DAY CENTER BUILDING FOR PEOPLE WITH AUTISM
- AMARYNTHOS TERMINAL - EXTENSION No. 1 - PHASE B E.P.M.
- EXECUTION OF REMAINING CIVIL ENGINEERING WORKS FOR THE COMPLETION OF EXTENSIONS No. 3 & No. 4 OF THE 400/150 KV ACHELOOY SUBSTATION
- EXTENSION OF THE BRIDGE ON THE NO. 25 MAIN PROVINCIAL ROAD IN THE SECTION ACHLADOCHORI – DIASELLOS
- Regeneration of public spaces in Palaia Volos
- AGIOS CHRISTOPHOROS SUBSTATION